20 APR 23 rescheduled
CITY OF JACKSONVILLE, ARKANSAS
RESCHEDULED PLANNING COMMISSION MEETING
APRIL 23, 2020
6:30 P.M. – 7:10 P.M.
OPENING REMARKS:
The Planning Commission of the City of Jacksonville, Arkansas met in a
regular session on April 23, 2020. Chairman Stroud opened the meeting
at approximately 6:30 p.m. expressing appreciation to those in
attendance. Chairman Stroud offered the invocation.
ROLL CALL: Commissioners Gary Sipes, Billy Hall, Vivian Brittenum,
Jeff Twitty, Dan Brown, and Greg Bollen answered ROLL CALL. Chairman
Mark Stroud also answered roll call and declared a quorum. PRESENT
(7), ABSENT (1).
Chairman Stroud welcomed new Commissioner Greg Bollen.
Others present for the meeting were Public Works Director Jim Oakley.
Tommy Bond and Aaron Robinson were on teleconference.
CORRECTION AND/OR APPROVAL OF MINUTES: It was announced that the
minutes of March 9, 2020 would be available at the next meeting.
PUBLIC HEARING(S):
REQUEST TO APPROVE PLAT(S): a. SKETCH PLAT Sam’s Settlement
Chairman Stroud identified Bond Engineering as representatives for
developer Greg Heslep.
Mr. Tommy Bond related that originally there were 84 lots, but 2 have
been taken out to be used for storm drainage retention. He then added
that all of the lots would be serviced by gravity sewer and would have
Jacksonville water. He noted that this area was in contention with
the City of Sherwood, and the area was turned back to the City of
Jacksonville to be a part of Jacksonville.
Chairman Stroud confirmed with Mr. Bond that the legal descriptions
have been corrected along with other items requested by the
Engineering Department.
Public Works Director Jim Oakley noted the concern that the
Subdivision has only one ingress/egress, saying that it would have
been better to have a second road in the vicinity of the retention
basin. He questioned Mr. Bond as to the feasibility of making that
happen.
Mr. Bond stated that he would be willing to try and see if that could
be worked out, adding that it would be very difficult because of the
lot that is out of the Subdivision and it would be hard to get around
that.
Public Works Director Jim Oakley stated that he would like to look at
that between now and the preliminary plat presentation.
Mr. Bond agreed.
1
CITY OF JACKSONVILLE, ARKANSAS
RESCHEDULED PLANNING COMMISSION MEETING
APRIL 23, 2020
6:30 P.M. – 7:10 P.M.
Public Works Director Jim Oakley informed the Planning Commission that
this property was a land swap with Sherwood on General Samuels Road.
Commissioner Bollen moved, seconded by Commissioner Twitty to approve
the sketch plat of Sam’s Settlement as presented. MOTION CARRIED.
b. PRELIMINARY PLAT Graham Woods PH 4
Mr. Aaron Robinson of Bond Engineering presented as representative for
Ms. Dana Nixon, developer. He stated that phase 4 consists of 93
lots, explaining that it consists of a culdesac and then another road
both accessing off Graham Road. He then added that there are a few
lots off the back of the phase that are in the flood plain, saying
that they would fill the lots to have them removed from the flood
plain and then submitted to the Water and Sewer Departments. He noted
that those Departments have not had a meeting yet, but they have
answered all questions from both Departments.
Mr. Robinson answered Chairman Stroud that the flood plain develop
permit application is the only outstanding item from Engineering
requests, explaining that it cannot be addressed until the
construction process begins. He noted that they added the sidewalk
along Magnolia Street and are waiting on the Water and Sewer
Commissions to meet for their approval. He stated that the concrete
ditch was added and the sidewalk will be ADA compliant. He then
further noted that the swell details and sidewalk details were changed
and the location of the street light was moved. He stated that all the
questions have been answered, noting that it is just not discernable
on the preliminary plat.
Mylissa Griggs, City Engineering Technician, offered that all
Engineering concerns have been addressed, agreeing that it is not
visible since it is part of the design, which will be monitored along
the process of development. She then asked that any approval be
contingent upon water and sewer approval.
Chairman Stroud answered Commissioner Montgomery that the entire
Subdivision has two entrances.
Mr. Robinson added that during phase 1, 2, and 3 there were three
accesses onto Graham Road and those accesses lead to phase 4 via
Westwood Drive. He then explained that Redbud will loop around and
connect to Westwood Drive.
Chairman Stroud confirmed with Public Works Director Jim Oakley that
the culdesac does meet City codes.
Commissioner Montgomery moved, seconded by Commissioner Twitty to
approve the preliminary plat of Graham Woods PH 4 contingent upon
acceptance of the sewer and water from those Departments. MOTION
CARRIED.
2
CITY OF JACKSONVILLE, ARKANSAS
RESCHEDULED PLANNING COMMISSION MEETING
APRIL 23, 2020
6:30 P.M. – 7:10 P.M.
c. FINAL PLAT Site Work One
Chairman Stroud noted that the proposed development is on the agenda
for not only a final plat but also for a building permit as a one-lot
subdivision. He then noted that part of the property is in the flood
plain. He recognized Bond Engineering as the representatives for the
developer, Robert Waters.
Mr. Bond noted that the plat was first initiated and presented to the
Planning Commission approximately two years ago, adding that finally
all the issues have been worked out. He then related that they are
requesting a sidewalk waiver, adding that beyond that, he believes all
issues have been agreed upon.
In response to a question from Chairman Stroud, Mr. Bond answered that
they have filed for a flood plain permit with the County regarding a
flood plan fill permit.
Public Works Director Jim Oakley noted that the developer is
requesting waivers for the sidewalk and dumpster as well as leaving
the surface as gravel because of the heavy equipment. He then related
that these are general requirements for commercial property.
Mr. Bond clarified that the owner has six dumpsters that are used for
construction sites and not for business use on this site. He explained
that the developer contends that he has little to no waste on this
site.
Public Works Director Jim Oakley stated that the developer has to find
some way to dispose of any garbage generated on site. He then noted
that it was his understanding that the developer might bring in other
businesses in the future, adding that any waste concerns could be
addressed at that time.
Mr. Bond stated that he would assume that Mr. Waters would be paying
for water, sewer and City garbage billed by the City.
Public Works Director Jim Oakley clarified that any commercial
business over 4,000 square feet would require private garbage unless
it is broken up to be less. He added that it is a possibility, citing
that he believes the building will be approximately 7,500 square feet.
He then confirmed the plans include landscaping requirements as per
City codes. He then assured Chairman Stroud that a permit would not be
issued until the developer obtained his flood plain permit, making it
a nonissue for the final plat. He then assured Chairman Stroud that if
any additional businesses are added at this site, he would readdress
the issue of having a dumpster on site. He added that he did not feel
this to be a major issue, saying that the sidewalk would be a
significant waiver since everyone else is putting in sidewalks
generally speaking. He stated that there would be some concrete to
3
CITY OF JACKSONVILLE, ARKANSAS
RESCHEDULED PLANNING COMMISSION MEETING
APRIL 23, 2020
6:30 P.M. – 7:10 P.M.
the front of the building for dust-free parking but would leave the
entrance aprons as gravel because of the heavy equipment that would be
using the entrance.
Mr. Bond stated that with the heavy equipment, paving the aprons would
be torn up and it seems like a terrible waste. He then stated that
as far as the sidewalk, there is no sidewalk to the north or south of
this property to connect onto, noting that once again the heavy
equipment will be crossing back and forth.
Council Member Sipes moved, seconded by Commissioner Bollen to approve
the Final Plat of Site Work One with waivers for the sidewalk and
dumpster requirements as well as a waiver to have a gravel drive
instead of a hard surface such as concrete contingent that all flood
plain permits are approved. MOTION CARRIED.
BUILDING PERMIT(S): REVISED SITE PLAN Site Work One
Council Member Sipes moved, seconded by Commissioner Twitty to approve
the revised site plan for Site Work One pending their obtaining a
flood plain permit before the building permit is issued. MOTION
CARRIED.
GENERAL:
Chairman Stroud without objection; adjourned the meeting at
approximately 7:10 p.m.
Respectfully submitted,
_________________________
Susan L. Davitt
4