93 JULY 12.doc
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
JULY 12, 1993
7:00 P.M. - 8.40 P.M.
OPENING REMARKS: Chairman Bart Gray Jr. opened the meeting,
welcomed those in attendance and requested ROLL CALL.
ROLL CALL:
Commissioners: Rudy Reid, Connie Foster, Jim Dornblaser, Art
Brannen, Tad Green, Lester Piggee, Paul Payne and Jack Patton, were
present. Chairman Gray also answered ROLL CALL and declared a
quorum. PRESENT nine (9). ABSENT (0).
Others in attendance for the meeting were Engineer Duane Reel,
Code Enforcement Officer Wayne Cox, Computer Technician Mylissa
Founds and Receptionist of the Engineering Department Terri
Hartley, petitioner and interested citizens.
APPROVAL AND/OR CORRECTION OF MINUTES:
Regular Planning Commission Meeting of June 14, 1993
Commissioner Brannen moved, seconded by Commissioner Patton that
the minutes of the June 14, 1993 Planning Commission Meeting be
APPROVED with the following addition: “Commissioner Dornblaser
was present and Commissioner Piggee was absent." MOTION CARRIED.
REQUEST TO SET UP PUBLIC HEARINGS:
A verbal request was submitted by Mr. Fred West for the rezoning
of Lots 3, 4, 9 & 10 Grace Brown Addition (Revised) (general
location: on James Street between Poplar & Vine Streets).
Commissioner Piggee moved, seconded by Commissioner Dornblaser
that a public hearing be set for 7:00 p.m. at the next Regular
Planning Commission Meeting regarding the rezoning of Lots 3, 4, 9
& 10, Grace Brown Addition (Revised) contingent upon Mr. West
presenting a $50.00 advertising fee at sometime during the present
Planning Commission Meeting. MOTION CARRIED.
REQUEST TO APPROVE BUILDING PERMITS:
1. 804 Trickey Lane / Petitioner: Joe Lehman
Mr. Lehman was not present.
City Engineer Duane Reel voiced that he had told Mr. Lehman that
he would represent him at the meeting. He said that the request
of Mr. Lehman is to construct a garage in which to park his truck,
boat, camper etc. He related that Mr. Lehman owns the lot, which
joins the lot on which his home is located, and explained that
they were not purchased a the same time.
Chairman Gray questioned whether the parcel had been before the
commission previously for platting or subdividing.
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
JULY 12, 1993
7:00 P.M. - 8.40 P.M.
City Engineer Reel related that it had not, that it is one of two
lots owned by Mr. Lehman.
Commissioner Dornblaser questioned the proposed use of the garage.
City Engineer Reel voiced that it is to store his vehicles and
boats, mentioning items related to his work as well.
Commissioner Payne related that the parcels are legally described
by meets and bounds.
Commissioner Patton related that he felt Mr. Lehman should attend
the meeting to answer the questions of the Commission.
Commissioner Patton moved, seconded by Commissioner Brannen that
the building request of Joe Lehman for 804 Trickey Lane be tabled
until Mr. Lehman is present to share his intentions regarding the
building permit request. MOTION CARRIED.
2. FIRST JACKSONVILLE BANK/RECONSTRUCTION
Alderman Larry Wilson, President of the First Jacksonville Bank,
represented the item before the Planning Commission.
Chairman Gray and Mr. Rudy Reid voiced that they would not enter
into any of the voting process due to a conflict of interest.
Mr. Wilson voiced that there are a possible 128 parking spaces
which are ample according to city codes. He related that the
building will be a three-story one and requested a waiver of
seventy feet with regard to height of the building.
There were comments from several of the Commissioners with regard
to the project and how it would enhance the downtown area of the
city.
Commissioner Brannen moved, seconded by Commissioner Dornblaser
that the reconstruction of the First Jacksonville Bank be APPROVED
with a waiver of seventy (70) feet with regard to height. MOTION
CARRIED by unanimous ROLL CALL vote.
REQEST TO APPROVE PLATS:
a. FINAL PLAT / Tara Mount Subdivision Lots 88-97
It was pointed out that this will be the last phase of Tara Mount
Subdivision.
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
JULY 12, 1993
7:00 P.M. - 8.40 P.M.
City Engineer Reel said that the subdivision is complete except for
the letters of approval from Water and Wastewater Utilities.
Mr. Tim Lemons pointed out on a plat of Tara Mount Subdivision,
presented at the meeting, that lots 95F and 96F are not included
He explained FHA regulations regarding lots in the flood zone and
how it related to subdivision approval by that agency. He said
that when someone purchases Lot 95, 95F will be deeded to that
person and likewise with 96 and 96F.
Commissioner Patton moved, seconded by Commissioner Piggee that the
FINAL PLAT of Tara Mount Subdivision as presented a the Planning
Commission Meeting (without 95F and 96F indicated on the Map) be
APPROVED with the stipulation that letters of approval from the
Water and Wastewater utilities be received. MOTION CARRIED.
b. FINAL PLAT / Jenny Lynn Subdivision
City Engineer Reel said that the subdivision is complete except for
the asphalt being laid, which is scheduled for Thursday, July 15,
1993, and receipt of letters of approval from the Water and
Wastewater Utility after their meeting in the month of July.
It was pointed out by Mr. Green that the square footage has been
increased in the Bill of Assurance for lots and one (1) through six
(6) to 1300, for lots 7, 8 and 9 to 1200 and for lots 10, 11 and 12
to 1100, and that driveways be built to accommodate two cars or 18
feet wide.
It was pointed out that the fifteen foot sideyard setback
accommodates two lots, one and six, which will face Mandy Cove, and
that the 25 foot setback along Northeastern Avenue relates to all
other lots in the subdivision.
Commissioner Dornblaser moved, seconded by Commissioner Brannen
that the FINAL PLAT of Jenny Lynn Subdivision be APPROVED with the
stipulation that letters of approval be received from the Water and
Wastewater Utility, that the street be completed to the
satisfaction of the City Engineer and with lots 1 through 6 facing
Mandy Cove. MOTION CARRIED.
Commissioner Patton left the meeting at approximately 7:40 p.m.
3. FINAL PLAT / Rebsamen Medical Subdivision # 1
City Engineer Reel related that the six lots in the subdivision all
face John Harden Drive and are immediately south of the property
where Robbie Walker's Physical Therapy Office is located. He said
that the streets are already intact and that approval from Water
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
JULY 12, 1993
7:00 P.M. - 8.40 P.M.
and Wastewater Utility are forthcoming as with the two other plats
just approved by the Commission.
It was pointed out that lots five (5) and six (6) are in the flood
zone with suggestion by Chairman Gray that lots 5 and 6 be
designated with an F.
Commissioner Brannen moved, seconded by Commissioner Dornblaser
that the FINAL PLAT of Rebsamen Medical Subdivision #1 be
APPROVED with the stipulation that Lots 5 & 6 be designated Lot 5F
and Lot 6F and that letters of approval from the Water and
Wastewater Utilities be received. MOTION CARRIED.
4. SKETCH PLAT AND FINAL PLAT PHASE 1 / Penn Addition
City Engineer Reel voiced that the plat includes three lots facing
Southeastern Avenue presented previously to the Commission and that
a request for information regarding the amount of property owned by
Mr. Penn and his intent for the use of it was made by the
commission.
The item of business was presented by Mr. Penn's son, Richard Penn.
Mr. Reel related that the existing street serves as an open channel
and is a natural drain.
The size of the three lots facing Southeastern were discussed and
it was determined that the sixty (60) ft. lots would require the
property being rezoned form R-0 to R-1. Mr. Richard Penn said
there would be no problem with the developer in requesting the
rezoning.
There was discussion regarding a side. street and whether or not it
should be developed at this point: The general consensus was that
it would need to be developed at the time the lots west and north
of the street are developed.
Commissioner Brannen moved, seconded by Commissioner Payne to
APPROVE the SKETCH PLAT of PENN ADDITION with the stipulation that
lots 1, 2 and 3 be rezoned from R-0 to R-1. MOTION CARRIED.
Mr. Richard Penn related that Mr. Akridge has verbally agreed to
enter into the development of the street.
The development of half streets was discussed with City Engineer
Reel voicing that past experience has not been good.
It was the consensus of the Planning Commission that the FINAL PLAT
would not be dealt with until after the rezoning of the three lots
along Southeastern is finalized.
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
JULY 12, 1993
7:00 P.M. - 8.40 P.M.
Commissioner Brannen moved, seconded by Commissioner Foster to set
a public hearing for 7:00 p.m. at the next Regular Planning
Commission Meeting regarding the rezoning of Lots 1, 2 & 3 of the
Penn Addition from R-0 to R-1. MOTION CARRIED.
6. SKETCH PLAT and PRELIMINARY PLAT PHASE 1 / Penn Point
Subdivision
City Engineer Reel voiced that Mr. Richard Penn has acquired
thirty-eight of thirty-nine acres of property on the northwest
quadrant of the intersection of Harris Road and the new extension
of West Main Street immediately behind the houses which face Harris
Road from the west side.
He said that the city has no problem with the sketch plat.
Commissioner Brannen raised a question regarding the length of the
culdesac (527 feet). He pointed out the code requirement of five
hundred (500 feet).
There was a lengthy discussion regarding ingress and egress into
the subdivision and the possibility of tying streets together in
future development of property owned by Metropolitan Trust.
Alderman Keaton, representing the developer, voiced that sewer is
available to serve the lots indicated on the Sketch Plat and
Preliminary Plat.
He said that an outlet going north could be a planning possibility
in a Final Plat.
Commissioner Payne moved, seconded Commissioner Piggee that the
Sketch Plat of Penn Pointe be APPROVED as presented with some
adjustments on the release point on the road to the west. MOTION
CARRIED.
Mr. Keaton voiced that the proposed fourteen acre lake will
probably be "common property" owned by the property owners along
the lake. He said that the lower side of the lots are in the flood
zone and that a final plat may possibly be altered with regard to
the same.
There was discussion regarding flood plain regulations.
Commissioner Brannen voiced further concern with regard to the 527
foot culdesac and the possibility of the safety of residents in an
emergency situation.
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
JULY 12, 1993
7:00 P.M. - 8.40 P.M.
Mr. Keaton voiced that the lake is a part of the development and
that property owners will be assured of the same adding that
maintenance, mowing, improvements, etc. will be the responsibility
of the property owners.
It was noted that access to the lake exists between lots 13 and 14
and 8, 9 and 10.
Commissioner Payne moved, seconded by Commissioner Dornblaser that
the PRELIMINARY PLAT of PENN POINTE SUBDIVISION be APPROVED with a
waiver for the length of the culdesac and the stipulation of
further easements. MOTION CARRIED.
DEVIATION IN AGENDA:
Chairman Gray apologized for not being in attendance at the last
Planning Commission Meeting and voiced appreciation to Commissioner
Brannen for his good work as Vice Chairman.
Chairman Gray noted that Mr. Fred West presented a $50.00 check and
legal description to rezone Lots 3, 4, 9 and 10 of the Grace Brown
Subdivision (Revised) to City Engineer Reel during the Planning
Commission Meeting. (See requests to set public hearing in these
minutes.)
ADJOURNMENT:
Commissioner Brannen moved, seconded by Commissioner Piggee that
the meeting adjourn at approximately 8:40 p.m. MOTION CARRIED.
Respectfully,
___________________________
Lula M. Leonar
Planning Commission Secretary
CITY CLERK-TREASURER