04 MAY 10.doc
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
MAY 10, 2004
7:04 P.M. – 7:43 P.M.
OPENING REMARKS:
Chairman Brannen opened the meeting at approximately 7:00 p.m.
expressing appreciation for those in attendance.
ROLL CALL: Commissioners: Susan Dollar, Chad Young, Bobby Lester,
Glen Keaton, Mark Stroud and William Montgomery answered ROLL CALL.
Chairman Brannen also answered ROLL CALL and declared a quorum.
PRESENT SEVEN (7), ABSENT TWO (2).
Others present for the meeting were City Engineer Whisker, Mr. Tommy
Bond, Mr. Jim Peacock, and Alderman Stroud, members of the press,
interested citizens and petitioners.
APPROVAL AND/OR CORRECTION OF MINUTES:
Commissioner Young moved, seconded by Commissioner Montgomery that the
minutes of the 12 April 2004 Regular Planning Commission meeting be
APPROVED as amended. MOTION CARRIED.
PUBLIC HEARING(S): a. REZONING Tract between McCain Road and Shannon
Drive from C-3 to R-1
Chairman Brannen opened the public hearing at approximately 7:02 p.m.
Mr. Tommy Bond related that the property is being requested for
rezoning to R-1, noting that four single-family houses are currently
located on the property. He added that a five-lot plat of the
property is also being submitted for preliminary and final plat
approval. He noted that the sewer is available on McCain Road.
With no one to speak against the rezoning request, Chairman Brannen
closed the public hearing at approximately 7:04 p.m.
City Engineer Whisker related that the property owner has decided to
rebuild the existing houses, adding that he advised the owner that he
would have to rezone the property and plat the property for single-
family development. He then answered that currently there is not any
commercially zoned property near the proposed rezoning property. He
explained that the lots that face Hwy 161 are commercial and the
remainder is residential.
Commissioner Young moved, seconded by Commissioner Lester to approve
the rezoning of a tract of land located between McCain and Shannon
Drive as requested. MOTION CARRIED.
REQUEST TO APPROVE PLAT(S): a. FINAL PLAT Hayley Heights Subdivision
Lots 1-13
Mr. James Butler stated that the letters of water and sewer acceptance
has been forwarded to City Engineer Whisker.
City Engineer Whisker noted that the area is located in the County and
that he has received letters of acceptance. He then answered that
sidewalks were not required at the time of preliminary plat approval.
1
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
MAY 10, 2004
7:04 P.M. – 7:43 P.M.
Commissioner Keaton moved seconded by Commissioner Montgomery to
approve the final plat of Hayley Heights Subdivision Lots 1-13.
MOTION CARRIED.
b. PRELIMINARY AND FINAL PLAT Rebsamen Medical Subdivision No. 2
Mr. Bond stated that the Commission had an opportunity to review the
plat last month at the regularly scheduled Planning Commission
meeting, adding that the subdivision belongs to the City of
Jacksonville. He stated that the Subdivision was planned in 1995
under then existing Planned Unit Development guidelines. He explained
that the property is being developed for sell to physicians, pointing
out that one parcel was previously sold for the development of the
Women’s Clinic at the corner of Marshall Road and Braden. He stated
that no further action was taken until now, explaining that there is a
physician interested in purchasing lot 5 for development of a doctor’s
office. Mr. Bond stated that when he was asked to prepare a legal
description; he suggested that the property be platted. He noted that
the inside streets are private and would be maintained by the property
owners, adding that the utilities were accepted and have been in since
1995. He acknowledged that there had been some confusion regarding
the location of the sewer, but added that the sewer is located, in the
proper place, as shown on the plat.
City Engineer Whisker related that the sidewalks would need to be
planned for along Marshall Road, adding that sidewalks inside the
development along the private streets would not be necessary.
Commissioner Lester moved, seconded by Commissioner Stroud to approve
the Preliminary and Final Plat of Rebsamen Medical Subdivision No. 2,
with sidewalks along Marshall Road. MOTION CARRIED.
c. PRELIMINARY AND FINAL PLAT of McCain Road and Shannon Drive
Mr. Bond related that the plat consist of five (5) small tracts,
adding that the improvements are established.
City Engineer Whisker noted that the utility company has requested a
20’ easement along the north side of the property along Tract 4 and 2.
In response to a question posed by Commissioner Keaton, Mr. Bond
stated that the 20’ easement would not interfere with the north side
of Tract 1, noting that the driveway could run parallel to the
easement. He then acknowledged that the one-story duplex would be
relocated out of the easement.
City Engineer Whisker related that the easement was requested in case
the utility needed, in the future, to loop a line or connect to the
roads.
Commissioner Keaton noted that the north side of the single-story
duplex is 16’ from the property line.
2
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
MAY 10, 2004
7:04 P.M. – 7:43 P.M.
Discussion ensued and it was noted that a 15’ easement would be
acceptable. City Engineer Whisker concurred with a 15’ easement,
noting that the utilities have to be approximately 10’ apart.
In response to a question from Commissioner Keaton, Mr. Bond concurred
that the easement could also be utilized as an access regarding Tract
2.
Commissioner Keaton moved, seconded by Commissioner Young to approve
the Preliminary & Final Plat of Tracts 1-5 on McCain Road and Shannon
Drive with a 15’ easement along the north side of the property through
tracts 4 and 2. MOTION CARRIED.
d. REPLAT of Tract 1, Part of Plot 6 LRAFB Main Gate Development
Mr. Bond stated that the property is where the Inn of America is
located, adding that the replat will remove the restaurant and
administrative building. He related that the restaurant and
administrative building would be demolished, leaving a vacant lot for
future development. He stated that City Engineer Whisker has
requested that the property line be redrawn to run a tangent line to
John Harden Drive. He noted that the property owner does not have any
objection to the request.
City Engineer Whisker stated that the property line would start at the
S88, ending at the 04 corner, and then run straight 97.7’ to S88,
running diagonally and perpendicular to the freeway.
Discussion ensued and it was agreeable to run the line either straight
or diagonally to the freeway.
Mr. Bond noted that the property was originally platted in 1954 or
1955.
City Engineer Whisker noted that the replat would separate Charades
and the old pool area.
Commissioner Stroud expressed concerns for when the structure is
raised, noting that the concrete goes up to the edge of the pool
enclosure.
Mr. Bond noted that the frame over the pool is a separate structure.
Commissioner Stroud questioned the possibility of leaving a 5’ area
for landscaping.
Mr. Bond stated that the setbacks for any future development should
address areas for landscaping.
Discussion ensued regarding setback concerns and landscaping
considerations regarding the existing structure and possible future
construction.
3
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
MAY 10, 2004
7:04 P.M. – 7:43 P.M.
In response to a question from Commissioner Keaton, Mr. Bond clarified
that the separate tracts would not have the same ownership.
City Engineer Whisker stated that he believes the property is being
replatted so the hotel could be sold separately from the vacant lot.
Mr. Bond then clarified that lot 2 would have separate access, adding
that development plans regarding lot 2 would be reviewed by City
Engineer Whisker for a building permit and landscaping approval.
Commissioner Stroud questioned if Lot 1R would meet the landscaping
Ordinance being so close to the front of the pool enclosure.
Mr. Bond noted that the building is 1’ off.
City Attorney Bamburg stated that a variance would need to be granted
for the pool and hotel, adding that if the replat is approved the
structures would not comply with setbacks or the landscaping
ordinance.
Mr. Bond introduced Mr. Tommy Lassiter as the representative of the
purchaser of Lot 2R.
Mr. Lassiter stated that the proposed buyer does not have any
objection to the property line being run straight to the freeway and
added that he would like to ascertain if the Commission has any
objection to a future curb cut from John Harden Drive regarding Lot
2R.
There were no objections voiced by the Commission.
Commissioner Stroud inquired as to Commissioner Young’s viewpoint of
shifting the proposed property line regarding landscape and aesthetic
considerations.
Commissioner Young noted that from a Code standpoint, any new
construction would have to adhere to proper Code setbacks for
commercial zoning, adding that it could not be a zero lot-line.
City Engineer Whisker related that there would be a 10’ rear yard
setback for C-3 zoning.
Commissioner Stroud noted that the replat is effectively making part
of the property a zero lot-line.
Commissioner Young and City Engineer Whisker agreed with the
assessment.
Discussion ensued that the building would have to be approximately 10’
from the property line to comply with Code.
4
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
MAY 10, 2004
7:04 P.M. – 7:43 P.M.
Commissioner Stroud pointed out that the proposed line split is
creating a zero lot-line regarding the existing pool enclosure and the
existing two-story building.
Commissioner Stroud questioned the feasibility of sliding the proposed
property line forward.
Mr. Lassiter stated that he does not have an issue with sliding the
property line, adding that if anyone were to have issue it would be
the buyers. He then clarified that the Commission is requesting a 10’
front yard setback for the pool enclosure and a 10’ rear yard setback
for Lot 2R.
Mr. Bond further acknowledged that he did not feel the requirement to
be a problem.
City Engineer Whisker stated that if the property line is moved, he
would like to have some assurance that the Charades building would be
removed because the new property line would run through the middle of
the existing building. He further requested structural assurance that
the dome pool enclosure would not be affected by the Charades building
being raised.
Mr. Bond stated that the pool structure and the Charades building were
built at separate times.
Discussion ensued regarding where the property line cuts through and
it was further noted that the drive through is not a part of the
existing structure.
City Engineer Whisker stated that he was not certain if the structure
was freestanding.
Mr. Bond noted that the drive through structure would be coming down.
City Engineer Whisker added that the utility company has requested a
20’ easement across the north side of Lot 1R and a 10’ easement across
the north of Lot 2R.
That easement request was negotiated to a 15’ easement across the
north side of both Lots 1R and 2R.
Commissioner Young moved, seconded by Commissioner Dollar to approve
the replat of Tract 1, Part of Plot 6 LRAFB Main Gate Development
stipulating a 10’ front yard setback for Lot 1R and a 10’ rear yard
setback for Lot 2R; a 15’ utility easement along the north property
line; written non-dependant building structural assurance to the City
Engineer; moving the lot line to either perpendicular or diagonal to
John Harden Drive and assurances that the Charades building will be
removed. MOTION CARRIED.
5
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
MAY 10, 2004
7:04 P.M. – 7:43 P.M.
e. FINAL PLAT of Maple Wood Subdivision
Mr. Bond related that the street asphalt work has been completed and
that all utilities have been accepted by their prospective
Commissions.
City Engineer Whisker agreed, adding that he his holding bonds
regarding 5’ sidewalk construction, that is proposed to be 3’ off the
curb running along the back of Harris Road from the existing sidewalk
and almost touching General Samuels.
Commissioner Stroud moved, seconded by Commissioner Montgomery to
approve the Final Plat of Maple Wood Subdivision as presented. MOTION
CARRIED.
f. FINAL PLAT of Forest Oaks PH I
Mr. Bond stated that this a companion project of the Maple Wood
Subdivision, adding that PH I is part of the total 28 lots previously
accepted by the Sewer Department. He stated that the Subdivision
would be a gated community, adding that PH I is the southern portion
of the development. He stated that, hopefully, the Sewer Department
will finish the West Interceptor line shortly and the developers can
continue being able to develop additional lots. He then noted that
the entire Crooked Creek Subdivision is almost completely developed.
He then related that the streets in the Forest Oaks Subdivision are
proposed to be private and that the Bill of Assurance directs that as
such the property owners in Forest Oaks will maintain the streets.
City Engineer Whisker related that he has letters of acceptance from
the Water and Wastewater Departments. He reiterated that the streets
would be maintained by the property owners and not by the City of
Jacksonville because the Subdivision is gated.
Mr. Bond stated that a property owners association would maintain both
the gates and streets.
City Engineer Whisker then noted that he is holding the bond regarding
sidewalk construction. He related that the sidewalks inside the
Subdivision would be 4’ in width, 3’ off the back of the curb.
Commissioner Keaton moved, seconded by Commissioner Lester to approve
the Final Plat of Forest Oaks Subdivision PH I. MOTION CARRIED.
BUILDING PERMIT(S):
GENERAL:
ANNOUNCEMENT:
6
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
MAY 10, 2004
7:04 P.M. – 7:43 P.M.
ADJOURNMENT:
Chairman Brannen without objection, adjourned the meeting at
approximately 7:45 p.m.
Respectfully,
____________________________
Susan L. Davitt
Planning Commission Secretary
7