13 DEC 09
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
DECEMBER 9, 2013
7:00 P.M. – 7:17 P.M.
OPENING REMARKS:
The Planning Commission of the City of Jacksonville, Arkansas met in
regular session on December 9, 2013. Chairman Ott opened the meeting
at approximately 7:00 p.m. expressing appreciation to those in
attendance.
ROLL CALL: Commissioners Scott Scholl, Jim Moore, Joe Cummings, Jr.,
Rick White, and Alderman Bill Howard answered ROLL CALL. Chairman Ott
also answered roll call and declared a quorum. PRESENT (6), ABSENT
(3).
Others present for the meeting were City Attorney Bamburg, City
Engineer Jay Whisker, interested citizens, petitioners, and press.
CORRECTION AND/OR APPROVAL OF MINUTES:
Alderman Howard moved, seconded by Commissioner Moore to approve the
minutes of the regularly scheduled Planning Commission meeting of 12
November 2013 as presented. MOTION CARRIED.
PUBLIC HEARING(S):
REQUEST TO APPROVE PLAT(S): a. FINAL PLAT: Entergy-Jacksonville
Subdivision 7801 John Harden Drive
Mr. Tim Tyler representing Entergy presented the final plat,
explaining that the substation and all improvements have been
completed. He stated that the substation has been finished for awhile
and he believes all requirements have been met.
City Engineer Whisker recalled that the plan was to use the area to
the rear of the building for storage, noting that Entergy built a very
nice building to the front of the property, which is gated to limit
access. He pointed out that Entergy constructed a sidewalk in front
of lot 1 and that the property has water and sewer.
Mr. Tyler then answered that he did not believe Entergy has any plans
to construct anything on the remaining vacant property.
Commissioner Moore stated that the aesthetics of the building is an
added enhancement coming into Jacksonville; he added that the
development is a nicer facility than the one on Marshall Road.
City Engineer Whisker pointed out that with the bend in the freeway
and the location of the building it draws attention to the building as
your coming into Jacksonville. He then related that Entergy has
offered some of the vacant property to the north for placement of a
“Welcome to the City of Jacksonville” sign.
Commissioner White moved, seconded by Commissioner Moore to approve
the Final Plat of Entergy-Jacksonville Subdivision as presented.
MOTION CARRIED.
1
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
DECEMBER 9, 2013
7:00 P.M. – 7:17 P.M.
b. PRELIMINARY PLAT: Lots 1, 2, & 3 Cavin Estates
Mr. Jim Butler representative of the developer Charles Cavin, stated
that the property was formerly a trailer park off of Hwy. 161. He
related that the property consists of 5 acres and Mr. Cavin is
proposing to redevelop the property for single family residence. He
is platting 3 lots to begin with; pointing out that the property
already has water, sewer, curb and gutter. He then added that within
the last few months Mr. Cavin installed a sidewalk in front of lots 1-
3.
City Engineer Whisker recalled that the property was formerly the
Halleluiah Trailer Park. He related that Mr. Cavin removed the
trailers and demolished all the structures except for one. He stated
that in 2007, Mr. Cavin proposed to subdivide the property into 26
lots and was approved as a preliminary plat. He explained that part
of the lots will front Boroughs Road and the next lots will turn and
go down Mayfair Road, which will consists of approximately 8 to 10
lots. He then added that there would be 12 internal lots. He stated
that lots 1-3 already has curb and gutter so they would be the easiest
to develop. He stated that the City had requested sidewalk and an
inlet where Mr. Cavin’s property joined the neighboring property
belonging to Mr. Youngblood. He related that Mr. Cavin hired someone
to construct the sidewalk and inlet. He continued explaining that the
road with curb and gutter is already existing so the inlet box was
constructed and while it tis effective it is not aesthetic. He stated
that the curb and gutter is part of the problem of what would be
developed as lot 1, adding that there are no such concerns for lots 2
and 3. He clarified that the issue is more about lot 1 and how it
connects to Mr. Youngblood’s property. He offered that no plans were
submitted when the sidewalk was being constructed, explaining that Mr.
Cavin was planning to have those improvements completed and return to
get preliminary and final plat approval but it has now been over a
year since he submitted the preliminary plat to the Planning
Commission for approval. Therefore, the preliminary plat has to be
resubmitted for approval again, so any design issues would have to go
back through the Planning Commission. He stated that the inlet is a
bad fix to what was a bad problem but it was not a problem until the
property was being developed.
In response to a question from Chairman Ott, City Engineer Whisker
stated that it would be up to the Planning Commission if the inlet is
redesigned. He went on to say that lots 2 and 3 are finished and can
be final platted. He then stated that he believes Public Works
Director Jim Oakley will request a fix of lot 1. He stated that it
would not be unwarranted but currently it is an effective fix although
it is not pretty.
Mr. Butler answered that he felt Mr. Cavin would make the fix if it is
required. He added that he is not sure what the problem with the
current inlet is.
2
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
DECEMBER 9, 2013
7:00 P.M. – 7:17 P.M.
City Engineer Whisker explained that the existing curb and gutter is
lower than the asphalt and part of the curb and gutter was asphalted
over. He added that the pipe had to be extended back through to the
curb.
Commissioner Moore noted that it has an extra length of concrete that
covers the pipe extension from Mr. Youngblood’s pipe to the storm
drain inlet, which covers up more of the curb.
City Engineer Whisker pointed out that it could be used as part of the
driveway when a homebuilder constructs a house on that lot. He added
that whoever buys lot 1 should be aware of the issue and that it needs
to be addressed and that the City is not responsible to fix the
current situation. He stated that sometimes even when you say “buy
beware” they end up coming back to the City, which has been a problem
in the past.
Commissioner Moore pointed out that another concern for him is that
the City requires an engineer to sign off on the preliminary plat.
Mr. Butler assured Commissioner Moore that it would not be a problem.
Commissioner Moore noted that in 2007 there was an engineer that
signed off on the preliminary plat but that was before the inlet was
put in.
City Engineer Whisker stated that the preliminary plat will need to be
signed off by an engineer before Planning Commission approval can be
given.
Mr. Butler stated that he was not aware of these issues but he would
be glad to get with Mr. Cavin and City Engineer Whisker to work on
this situation. He went on to say that he believes Mr. Cavin would be
receptive to addressing any problems or issues in order to be able to
get a final for lot 1. He added that in-between now and submittal of
the final plat next month he would be willing to visit with City
Engineer Whisker to determine a solution that would be satisfactory to
the City. He stated that they would execute the certificates for
engineering.
Commissioner Moore issued concerns regarding a sunken area directly
behind the storm drain on lot 1, questioning if that is part of the
drainage for the lots.
City Engineer Whisker stated that the drainage is typically located
behind the lots, explaining that drainage flows to the rear.
Chairman Ott noted that approval for the preliminary plat would need
to address the necessary engineering certificates as well as any
drainage issues before being finalized.
3
CITY OF JACKSONVILLE, ARKANSAS
REGULAR PLANNING COMMISSION MEETING
DECEMBER 9, 2013
7:00 P.M. – 7:17 P.M.
Mr. Butler stated that those conditions would be satisfactory for the
developer.
Commissioner White moved, seconded by Commissioner Moore to approve
the Final Plat contingent that the proper engineering certificates be
completed and signed and all drainage issues properly be addressed.
Commissioner Moore noted that on the 2007 preliminary plat the
easement line stopped behind Mr. Youngblood’s property, questioning if
there is an easement that runs behind the proposed lots.
City Engineer Whisker noted that the sewer easement runs off the back
of lots 12-5 so there is not an easement behind lots 1-3, he added
that he believes the sewer will come off the front of the property on
Boroughs Drive.
At this time, MOTION CARRIED.
BUILDING PERMIT(S):
GENERAL:
ANNOUNCEMENT:
ADJOURNMENT: Chairman Ott without objection adjourned the meeting at
approximately 7:17 p.m.
Respectfully submitted,
_________________________
Susan L. Davitt
4